Additional Information and Resources:
 

Enovity, Inc.
Enovity, Inc.
100 Montgomery Street
Suite 600
San Francisco, CA 94104

For more information contact:

General Information
415-974-0390 ext. 148
boilerefficiency@enovity.com

Rachel Christenson
Program Manager
415-974-0390 ext. 104
rchristenson@enovity.com

Eric Koeppel, P.E.
Director of Technical Services
415-974-0390 ext. 108
ekoeppel@enovity.com

 

Upcoming Industry Events*

There are no events scheduled at this time.

*Enovity is vendor neutral. Promotion of an event does not imply Enovity’s endorsement of the products or services provided by the companies hosting the events”.

Have an upcoming event related to boiler energy efficiency? Get it posted here!
Send information about
the event to rchristenson@enovity.com

Monitoring-Based Persistence Commissioning Program for Existing Buildings

Commercial
Industrial Boiler Efficiency
Program (CIBEP)

Get Cash Incentives For Your Energy Efficiency Upgrades

Cash IncentivesThe Commercial Industrial Boiler Efficiency Program, a partnership with Pacific Gas and Electric Company, provides no-cost technical services and cash incentives to identify and implement energy efficiency improvements for boiler systems.

 

No-Cost Program Services:

  • No-cost program servicesCustomized analysis and measurements to determine system efficiency
  • Detailed evaluation and recommendations for energy efficiency projects
  • Implementation coordination assistance
  • Report on reductions in energy, cost, and greenhouse gas emissions
  • Independent verification of achieved energy savings after installation
  • Cash incentives to help buy down the cost of energy efficiency upgrades

commercial boiler

Eligible Energy Efficiency Upgrades Include

  • Equipment and controls upgrades that result in quantifiable energy savings for the boiler
    • Potential upgrades include:
      • Feed water economizers
      • Condensing economizers
      • Direct contact water heaters
      • Burner Control Upgrades
        • Parallel positioning control
        • Boiler O2 trim control
        • Combustion fan VFDs
  • High efficiency boilers
    • In conjunction with other measures
  • Condensing boilers
  • Pipe / Tank / Hx Insulation
  • Pump VFDs
  • Condensate Recovery Systems
  • Others (Mechanical Vapor Recompression, SCRs, etc.)

Facilities

Eligible Facilities Include:

  • Food Manufacturers
  • Agricultural Producers
  • Beverage Producers
  • Wineries
  • Industrial and Manufacturing
  • High Tech and Laboratory
  • Industrial Laundries
  • Office Buildings
  • Large Hospitality
  • Colleges and Universities
  • Hospital and Large Medical
  • Gaming and Entertainment
  • Others
Measure Incentive
Electricity Saving Measures $100/kW and $0.09/kWh saved
Natural Gas Saving Measures $1.00/therm saved

 

This program may be modified or terminated without notice. Incentives are limited and available on a first come, first served basis.

California consumers are not obligated to purchase any full-fee service or other service not funded by this program. This program is funded by California utility ratepayers under the auspices of the California Public Utilities Commission.

Los consumidores en California no están obligados a comprar servicios completos o adicionales que no esten cubiertos bajo este programa. Este programa está financiado por los usuarios de servicios públicos en California bajo la jurisdicción de la Comisión de Servicios Públicos de California.

© 2009 Enovity, Inc. All rights reserved.

 

Eligibility Requirments
(Must meet all criteria listed below)
  • Facility must reside within PG&E service territory
  • Must pay either the electric Public Good Charge (PGC) and/or gas Public Purpose surcharge (PPS) as part of PG&E bill.
  • Qualifying boilers include:
    • Hot water boilers, steam boilers, and thermal fluid heat
    • Retrofits: Typically boilers 3.0 MMBTU or larger
    • New Construction: boilers 1.0 MMBTU or larger
  • Must have financial resources available to fund energy efficiency measure implementation
  • Other restrictions may apply, please call to confirm eligibility
  • Must allow reasonable access to facility
  • On-site assessments must demonstrate cost-effective energy savings opportunities
  • Incentives only available for cost-effective measures